Evidencia

Replacing a reporting system is not something you improvise

Your case handlers know their current tool, your cases are open, your obligations keep running. We build the switch around those constraints, for a transparent switch.

Our method

A configuration that starts from your organization, not from our screens

No two reporting programs look alike: the legal perimeter, the role of works councils, where HR sits and how investigators are spread all change the design. So we start from how your organization actually runs to define intake channels, handling paths and permissions — with the aim that your own leads run the platform unaided within weeks.

Four workstreams, run in parallel

01

Mapping your program

Who receives, who qualifies, who investigates, who decides. We write these rules down before touching any configuration.

02

Configuration

Channels, forms, handling paths, statutory deadlines and permissions translated into the platform.

03

Internal awareness

The material that explains the new channel to employees and removes any doubt about confidentiality.

04

Joint steering

Regular checkpoints, a shared timeline and decisions settled as they come up.

What we aim for

That raising a concern becomes a safe reflex inside your organization: one clear channel, deadlines that hold, decisions that can be traced — and teams who know a case never gets lost.

Evidencia
The questions you are already asking

A switch affects people as much as settings

These topics come up in almost every scoping conversation we have. We would rather put them on the table in the first meeting than discover them mid-project.

Cases already handled

Years of qualifications, evidence and decisions that must remain accessible and defensible. A switch does not reset the counter.

Whether the channel gets used

A program nobody uses is not a program. The reporting path has to stay readable for a shop-floor employee and for a manager abroad alike.

Deadlines that will not move

Open investigations, 7-day acknowledgements, 3-month feedback, annual reporting: the migration fits that calendar, never the other way round.

Internal sign-offs

Legal on compliance, IT on hosting, HR on handling paths, leadership on budget: each body has its own decision cycle.

How it runs

Four stages, on a timeline you know upfront

At any point you know what is under way, what is expected from you and what comes next. Our security and data protection commitments frame each of these stages.

ISO 27001
CSA STAR Level One
RGPD / GDPR
01

Scoping

Understand your program before configuring it

We review your current channels, handling paths and regulatory constraints, then agree the perimeter, the milestones and who is involved on each side.

A written timeline and assigned roles before any configuration.

02

Configuration

Translate your internal rules into the platform

Forms, intake channels, routing rules, notifications, deadlines and permissions are set up from the mapping signed off at scoping, then reviewed with you.

A setup that mirrors your rules, not a standard template.

03

Testing and training

Stress-test the program before opening it

We replay real cases end to end, fix what needs fixing, then train your compliance leads, HR contacts and administrators in separate sessions.

Nobody discovers the tool on the day it opens.

04

Opening and follow-up

Support the first months of real use

We support the launch communication, review the first reports with you and adjust the configuration in light of how the channel is actually used.

A program that settles in instead of fading out.

Included

What happens to your existing case history?

We inventory what sits in your current tool, decide together what is carried over, archived or left behind, then check the integrity of the imported data before opening. You sign off the perimeter in writing before anything moves.

Discuss your case history →
“An internal investigation tolerates neither a gap in the audit trail nor a contact who keeps changing. We hold migrations to the same discipline: a written perimeter, verified data, and the same team from scoping through the first months of use.”

Julien Mascaro

CEO, Evidencia

How the work splits

We run the project, you stay the decision-maker

A successful migration rests on one clear boundary: we own the platform and the method, you own your organization and its internal trade-offs. Here is what that means in practice.

Your organization

What you own

You settle the choices that commit your organization and make sure the program is understood internally.

  • Settle handling rules and permission levels
  • Engage internal bodies (legal, IT, HR, works council)
  • Update your procedures and reporting policy
  • Carry the communication to employees
Evidencia

What we take on

We take the technical and methodological load, and leave you self-sufficient on the platform.

  • Configure the platform from the signed-off mapping
  • Train your case handlers and administrators
  • Run the inventory and carry-over of your case history
  • Provide your communication and procedure templates
Your contacts

The same people from scoping to the first months of use

No hand-off between sales, delivery and support. Every role is named at kick-off, on our side and on yours, and stays identifiable for the whole project.

Project lead
Evidencia

Project lead

Holds the timeline, runs your checkpoints and remains your contact after opening to keep the program evolving.

Technical expert
Evidencia

Technical expert

Configures the platform, handles integrations and runs the carry-over of your data with the associated checks.

Program owner
Your organization

Program owner

Settles internal rules, engages the relevant bodies and drives communication towards employees.

IT / security lead
Your organization

IT / security lead

Validates hosting, the data transfer arrangements and alignment with your in-house security requirements.

At opening

What is already settled the day the channel opens

Opening is not the risky part: everything below has been signed off with you beforehand.

A stress-tested configuration

Real cases replayed end to end and corrected before opening.

Communication ready to send

Posters, internal notes and explainer pages adapted to your organization.

Case history carried over and checked

Perimeter signed off in writing and data integrity verified after import.

Self-sufficient case handlers

Your administrators can handle a case and train their peers internally.

Follow-up over the first months

Regular checkpoints with your project lead and accessible technical support.

Frequently Asked Questions

Everything you need to know

Let’s talk about your switch

One conversation is enough to frame the perimeter, the timeline and the carry-over of your cases.

Evidencia